no key · no human
Trends › Nigeria › story

Nigerian power outage

society A story tracked across 14 publishers in Nigeria, the whole story.

32
articles
14
publishers
Sep 23 07:29
first seen
Oct 21 12:48
last seen

Coverage over time

2026-09-23 07:29 UTC — 12026-09-23 21:36 UTC — 12026-09-24 11:43 UTC — 12026-09-25 01:49 UTC — 02026-09-25 15:56 UTC — 42026-09-26 06:03 UTC — 12026-09-26 20:09 UTC — 02026-09-27 10:16 UTC — 12026-09-28 00:23 UTC — 22026-09-28 14:29 UTC — 02026-09-29 04:36 UTC — 12026-09-29 18:43 UTC — 12026-09-30 08:49 UTC — 62026-09-30 22:56 UTC — 02026-10-01 13:03 UTC — 02026-10-02 03:09 UTC — 02026-10-02 17:16 UTC — 02026-10-03 07:23 UTC — 02026-10-03 21:29 UTC — 02026-10-04 11:36 UTC — 12026-10-05 01:42 UTC — 02026-10-05 15:49 UTC — 02026-10-06 05:56 UTC — 02026-10-06 20:02 UTC — 12026-10-07 10:09 UTC — 02026-10-08 00:16 UTC — 82026-10-08 14:22 UTC — 12026-10-09 04:29 UTC — 02026-10-09 18:36 UTC — 02026-10-10 08:42 UTC — 02026-10-10 22:49 UTC — 02026-10-11 12:56 UTC — 02026-10-12 03:02 UTC — 02026-10-12 17:09 UTC — 02026-10-13 07:16 UTC — 02026-10-13 21:22 UTC — 02026-10-14 11:29 UTC — 02026-10-15 01:36 UTC — 02026-10-15 15:42 UTC — 02026-10-16 05:49 UTC — 02026-10-16 19:56 UTC — 02026-10-17 10:02 UTC — 02026-10-18 00:09 UTC — 12026-10-18 14:16 UTC — 02026-10-19 04:22 UTC — 02026-10-19 18:29 UTC — 02026-10-20 08:35 UTC — 02026-10-20 22:42 UTC — 12026-10-21 12:49 UTC — 009-2309-2609-3010-0310-0710-1010-1410-1810-21

Who covered it

Articles

When (UTC)HeadlinePublisher
10-21 12:48TCN Restores 60MVA Kukwaba Transformer After 19-Hour Outage, Reopens Power Supply to 5 Abuja Axesreportcircle.com
10-18 12:22TCN Restores Gwagwalada Power After Transformer Shutdown, Limits Outage to 20 Minutesreportcircle.com
10-08 15:10TCN announces power outage after three towers collapse in Nasarawafreelanews.com
10-08 14:06Find out more as TCN announces power outage in several locations as 3 towers collapsewww.legit.ng
10-08 12:49Three Towers Collapse, Cut Power Supply To Nasarawa Communitiesthewhistler.ng
10-08 11:49Power Grid Suffers Major Blow As Heavy Rain Collapses Three TCN Towers, Cuts Keffi, Akwanga Supplythewillnews.com
10-08 10:52Three transmission towers collapse in Nasarawa following stormnewsspecng.com
10-08 09:35Blackout looms as TCN announces collapse of towers on Keffi, Akwanga linedailypost.ng
10-08 08:45TCN MOVES TO FIX 132/33KV KEFFI/AKWANGA SUBSTATIONS COLLAPSEextraordinairepeople.com
10-08 08:45TCN MOVES TO FIX 132/33KV KEFFI/AKWANGA SUBSTATIONS COLLAPSEextraordinairepeople.com
10-08 07:18TCN Tower Collapse Cuts Off Keffi, Akwanga Feeders as 3 Towers Fall in Rainstormreportcircle.com
10-07 07:04TCN Begins 8-Hour Planned Maintenance in Kubwa, Bwari, Other Abuja Areas to Replaces Faulty 33kV Breaker, Transformerreportcircle.com
10-04 15:31TCN Announces Urgent 2-Hour Gwagwalada Outage to Connect Earthing Reactor to 60MVA Transformerreportcircle.com
09-30 15:31National Library in Nasarawa laments 14-year power outagewww.lindaikejisblog.com
09-30 14:34FG, DisCos Meet on 24-hour Power Plan for High-demand Zonesafricathisday.com
09-30 14:08Find out more as power blackout hit 2 Nigerian states, TCN gives reasonwww.legit.ng
09-30 13:31FG Targets Kano For Proposed 24-Hour Power Zonethewhistler.ng
09-30 11:08FG Names Six Zones to Have 24 Hour Power Supply, Targets Energy Clusterswww.legit.ng
09-30 10:04Benin, Togo, Niger leave $10.17 million unpaid on Q2 2026 power invoices — NERCnairametrics.com
09-30 05:49FG targets 24-hour power supply with Energy Zones in high-demand areasnairametrics.com
09-29 17:15Blackout: TCN explains cause of power outage in Port Harcourt, Riversdailypost.ng
09-28 13:37TCN Begins Urgent Repairs on Vandalised Ikot Abasi-Eket Power Linenewsfocusng.com
09-28 13:37TCN Begins Urgent Repairs on Vandalised Ikot Abasi-Eket Power Linenewsfocusng.com
09-27 13:38Ambakederimo: Bayelsa can achieve 24-hour power economythenationonlineng.net
09-26 15:13200MVA Power Boost: TCN, Imcomtel Push Katsina Substation to Installation Stagereportcircle.com
09-25 22:18TCN Schedules 6-Hour Katampe Maintenance, Cuts Bulk Supply to 14 Abuja Communitiesreportcircle.com
09-25 22:13TCN Takes 330kV Gombe–Damaturu–Molai Line Offline for 4-Hour SCADA, PLC Upgradereportcircle.com
09-25 21:58TCN Revives Kano’s 40MVA Power Transformer After Earthing Unit Failure Cuts Supplyreportcircle.com
09-25 21:40Storm Snaps Kano’s Power Link as TCN Reroutes Supply to Keep Metropolis Runningreportcircle.com
09-24 17:18KEDCO explains power outage across eight Kano LGstelegraph.ng
09-24 10:28KEDCO explains reason for power outage in Kanodailypost.ng
09-23 07:29TCN Begins 6-Hour Maintenance on 100MVA Abuja Transformer, Cuts Supply to Wuse, CBD, Jabireportcircle.com

Get this as JSON

bash
curl -s "https://freenewsapi.ai/v1/trends/NG/nigerian-power-outage"